The leader track π€ Β· for heads of delivery, PMO leads & sponsors Β· 6 x 45 min Β· no tooling required
Thinking mode: what AI actually changes about delivery, what it must never touch, how to review an AI-drafted plan without reading every line, and how to roll it out to a PMO with a quality bar instead of a vibe. Each session ends with the questions to ask your PMs.
What AI changes about delivery
Split the PM week into artifact labour and judgment. What genuinely moves, what does not, and PMI's line on human oversight.
π Leader 2 Β· easyThe governed setup
Workspaces, connectors and permissions - and the one-page policy for what never goes into a prompt.
π Leader 3 Β· mediumPlans you can trust
The review rubric for an AI-drafted plan: invented dates, orphan owners, missing gates, dependencies nobody confirmed.
β οΈ Leader 4 Β· mediumRisk, dependencies & escalation
Early-warning signals worth trusting, the hard gates AI keeps smoothing over, and an escalation that survives a steerco.
π Leader 5 Β· decidingThe reporting cadence
A weekly rhythm a machine can maintain and a human can defend - plus the six checks that make a report actionable.
π Leader 6 Β· decidingRolling it out to a PMO
Pilot design, the quality bar, what to measure, and how to get adoption from PMs who have been burned before.
The PM track π οΈ Β· for PMs, TPMs & delivery leads Β· 10 x 45 min Β· one running programme, no code
Hands on the real artifacts, week by week, on the Northwind data platform programme: workspace, charter, milestones, dependencies, risk register, the status report (with a live simulator), meeting-to-actions, escalations, the connected weekly pack, and a full delivery week as a capstone.
Your programme workspace
One workspace per programme, the six-document context pack, and the house rules you will reuse for years.
π PM 2 Β· mediumMandate to charter
A vague sponsor email becomes a scoped charter: context, priorities, non-goals, and the questions you must ask back.
πͺ PM 3 Β· mediumMilestone architecture & WBS
Ladder M1-M6 with real gate criteria, decompose the work, and get the dates from the team - never from the model.
π PM 4 Β· hands-onDependencies & critical path
Extract dependencies from raw meeting notes, find the hard gate everyone forgot, and render the map in Mermaid.
π² PM 5 Β· mediumA risk register that maintains itself
Probability x impact, named triggers and owners, and a weekly refresh that surfaces what actually moved.
π PM 6 Β· mediumThe status report
Watch a fluent, empty report climb from 24 to 100 as you feed it the six things a steerco actually needs.
ποΈ PM 7 Β· easyMeetings to actions
Turn a messy steerco into decisions, actions and owners - and keep a decision log that stops the relitigating.
π£οΈ PM 8 Β· mediumStakeholders, escalations & hard messages
One truth, three audiences. Draft the escalation that gets a decision, and the bad-news message you can stand behind.
βοΈ PM 9 Β· hands-onConnect the system
Connectors to Jira, Notion and Sheets, your house rules as a reusable skill, and a weekly pack that runs on schedule.
π PM 10 Β· hardestCapstone: one full delivery week
Monday to Friday of Northwind's recovery week, end to end - and the list of things you never delegate.
Choose your path πΊοΈ
Two doors, one programme. Leaders set the guardrails and the quality bar; PMs build the artifacts behind them.
The knowledge map π§
Both tracks at a glance - hover a session to spotlight its concepts, click any node to jump in.